Kreyòl Ayisyen (ht) | Chanje Lang (Change Language)
  1. This project is aimed to fabricate the water pumping machine. Due to the topographical variation in Nepal’s Himalayan regions, people are facing problems of water in both drinking and irrigation supply though there are many rivers in Nepal. This has caused difficulty in many irrigation projects...
  2. 1980-01-01 The plan presented here is a detailed description of a 1-kilowatt (1-kW) generator unit, which was prepared in 1971. The plan is scheduled to be revised and updated in the near future in order to incorporate additional data. At the time, this plan was prepared, the generator had not been built on...